五层足尺预应力压接装配框架结构顶层角柱失效试验研究
师燕超, 李黎明, 郭海山, 李忠献, 史鹏飞, 赵博, 周健, 刘昊琨, 郭志鹏
Experimental study on a five-story full-scale post-tensioned prestressed precast frame with failure of top corner column
SHI Yanchao, LI Liming, GUO Haishan, LI Zhongxian, SHI Pengfei, ZHAO Bo, ZHOU Jian, LIU Haokun, GUO Zhipeng
建筑结构学报
.
2023, (05): 101
-113
.
DOI: 10.14006/j.jzjgxb.2021.0808